Planning and Mapping - This stage involves identifying the optimal route for the lines, avoiding existing underground utilities, and obtaining necessary permits., Trenching  - Making long cuts on the ground to accomodate underground lines like cables and pipelines., Pole Placement - The strategic organization and allocation of poles that carry the overhead lines (electricity, internet cables etc), Conduit and Cable Laying - Placement of cables and conduits, Connection - All cables, pipelines and conduits are connected to its sources, Testing - Voltage testing and thermographic checks, Inspection - Checking the integrity and safety of the system,

Utility lines - Installation phases