What was the jointing technique used in Part D of the day pratical? - Finger joint , What does a blue safety sign mean? - Mandatory Signs, What does PPE mean - Personal Protective Equipment, How are overhead cables recognised? - Red Barrier, How are site trenches protected from subsidence? - Battering back/ trench box, What is used at buildings of heights above 1.5m - Scaffolding, What tools are used in the manufacture of Part D - Chisel, Marking Gauge, Tenon saw, ruler, working drawing,
0%
Lesson 11 Recap
Share
Share
Share
by
Luke13kelly
5th Yr
Materials Technology
Edit Content
Print
Embed
More
Assignments
Leaderboard
Flash cards
is an open-ended template. It does not generate scores for a leaderboard.
Log in required
Visual style
Fonts
Subscription required
Options
Switch template
Show all
More formats will appear as you play the activity.
Open results
Copy link
QR code
Delete
Continue editing:
?