1) NPC Ukrenergo is __________ by the Ministry of Energy of Ukraine. a) managed b) developed c) cotrolled d) included 2) One of the functions of Ukrenergo is _________control of the integrated power system of Ukraine. a) dispatch b) export c) import d) financial 3) The company transmits electricity via trunk power grids from generating facilities to regional power grids of __________ system operators. a) distribution b) dispatch c) transmission d) national 4) Ukrenergo is also a commercial ___________ administrator and settlements administrator in the Ukrainian electricity market. a) metering b) transmitting c) distributing d) financial 5) Ukrenergo’s structure is based on the __________ principle. a) regional b) national c) financial d) transmission 6) Ukrenergo’s structure ________ 4 territorial grid maintenance administrations. a) includes b) dispatches c) transmits d) generates 7) ________ territorial grid maintenance administration of Odesa, Mykolaiv, Kherson, Zaporizhia, partially Dnipropetrovsk. a) Southern b) Western c) Northern d) Eastern 8) Dispatch control functions in the company are performed by 6 regional __________ centres. a) dispatch b) administration c) territorial d) transmission 9) TGMAs include 15 _______ grid maintenance centres. a) regional b) national c) international d) dispatch 10) 'Construction and Repair' carries out repairs, _________ cost estimate documentation for construction and installation, etc. a) develops b) produces c) transmits d) controls

Leaderboard

Visual style

Options

Switch template

Continue editing: ?