What certificate would be issued for new installation work? - Electrical Installation Certificate, Which of the following is not required to sign an Electrical Installation Certificate? - Client, On an EICR an observation Code 1 means - Danger present, On an EICR an observation Code 2 means - Potentially dangerous, How many parts make up an Electrical Installation Certificate? - 3, According to Guidance Note 3 what is the maximum allowed time between initial verification & first condition report? - 10 years, An observation Code 3 would be attributed where - An absence of notice indicating the installation has 2 colours to BS 7671, An observation Code 1 would be attributed where - An accessory is badly damaged, A lighting circuit has been extended and a spur added to a ring final circuit, what certification would be issued? - Two MEIWC's, On completion of initial verification, who would receive the EIC? - The client, What level of protection would be offered to the top horizontal surface of an enclosure? - IP4X, Which of the following would not be a reason for requesting an EICR? - Extension to an existing circuit, How many signatories are required on a MEIWC? - 1, Which earthing system is not recognised by BS 7671 for public distribution systems? - TN-C, What level of protection should be afforded to the front surface of an enclosure? - IP2X, What is the categorisation of fuse that has replaced BS 1361? - BS 88-2, RCD's & RCBO's with an IΔn of ≤ 30mA are installed as a means of offering - Additional protection, A bare & unsleeved CPC of a twin & CPC cable would receive which Code? - Code 3, A bonding clamp to BS 951 with a missing label stating, "Safety Electrical Connection Do Not Remove" would receive a - Code 3, A "borrowed neutral" e.g. where a single final circuit neutral is shared by two final circuits would be attributed - Code 2,

Leaderboard

Flash cards is an open-ended template. It does not generate scores for a leaderboard.

Visual style

Options

Switch template

Continue editing: ?