Fill system to required pressure and leave for 30 minutes., Note pressure and leave for further 30 minutes, Check if pressure loss is less than 06 bar and that there are no leaks, Visually inspect over 120 minutes, Check that there is no greater loss the 0.2 bar.

Level 3 8202 Hot Water (Soundness Testing B)

Leaderboard

Visual style

Options

Switch template

Continue editing: ?