If installing a lining with a Datum The Datum will usually be ____ off finish floor or FFL. Therefore if your door is ____ tall with a ____ gap at the top and a ____ gap at the bottom for carpet or other types of flooring. Therefore the underside of your lining will be 2000mm from finish floor. So you could mark 1000mm on your lining and align to the Datum.Offer in your lining so its central in the opening .Fix the top corner ,hanging side first ____ proud for ____ plasterboard and ____ skim coat. ____ up and fix the bottom of the same side using ____ and ____ where necessary. Then fix the middle. then go to the closing side again fix the top corner first making sure the head is level. Then again the bottom of the closing side checking for twist with your eyes ____ or using a plumb bob. Then fix using the remaining holes you have drilled . Double checking for plumb and straightness. Then loose cut and pin your door stops in.